Remove Drawings Remove Overhead Remove Reference Remove Subcontracting
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

Each project will encompass detailed line item construction task and reference specifications encompassing improvements, alterations, renovation, remodeling, major repairs, and minor new construction associated with ORGANIZATION NAME structures and properties. coefficient (reference table of allowable overhead). authorization.

Contract 100
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. Subcontracts. At the completion of the project, any savings associated with the Subcontract may be required to be passed along to the Order by way of a change order. Execution Procedures.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.