Remove Drawings Remove Renovating Remove Sustainability Remove Work in Progress
article thumbnail

Job Order Contracting Operations Manual

Job Order Contracting

facilities inspection programs generate requirements for sustainment, restoration, modernization work and minor new construction. JOC contract can be used to accomplish renovation, repair, and maintenance of buildings, structures, or other real property. Methods and alternatives for accomplishing the work. requirements.

Contract 100
article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Project cannot be expedited with a collaborative fast-track process; drawings and specs must be 100% complete to bid (though latter rarely occurs). IPD or LEAN Job Order Contracting) of design process, with the A/E typically working for the contractor. Disagreements related to intended quality of work are not uncommon.

Design 130
article thumbnail

Industry Focus: Logistics – Going With The Flow

Buisness Facilities Contributed Content

Consistent with the past few years, the 24th Annual State of Logistics Report expects slow albeit sustainable growth for the future, with the logistics GDP hovering somewhere between 2.5 Wilson believes that “the economy and logistics sector will slowly regain sustainable momentum, but we will still experience unevenness in growth rates.”.