Remove Drawings Remove Roads Remove Subcontracting Remove Visualization
article thumbnail

40 Under 40: Champions of Construction 2023

Autodesk Construction Cloud

At the core of Stephen's contributions lies his exceptional skill in optimizing Building Information Modeling (BIM) execution plans, setting elevated global practice standards, and significantly enhancing the quality of both models and contract drawings. This has enabled him to link these suppliers with subcontracting opportunities at Webcor.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. ALABAMA INDUSTRIAL ACCESS ROAD & BRIDGE PROGRAM: Provides financial assistance to communities for industrial access to new and expanding industries. It allows for the construction of roads, bridges, etc.

Income 75
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information. Requirements.