article thumbnail

Structural engineering solutions for office-to-residential conversion

BD+C

Structural engineering solutions for office-to-residential conversion 0 qpurcell Thu, 09/28/2023 - 10:37 Office Buildings IMEG's Edwin Dean, Joe Gulden, and Doug Sweeney, share seven key focuses for structural engineers when planning office-to-residential conversions. RELATED ARTICLE: About 11% of U.S.

article thumbnail

Different types of quantity surveyor in surveying field

Construction Cost Estimating

Consultant / Client Quantity Surveyor or PQS They perform a wide array of activities which range from cost planning, value management, feasibility studies, cost benefit analysis, life cycle costing, tendering, valuation, dispute resolution and cost estimating. Senior Quantity Surveyor –They take ownership as well as liability for the team.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Definition of Design Period | Why Design Period is Provided | Factors Affecting Design Period | Design Period Values

CivilJungle

For the projects whose augmentation is unquestionably feasible, it’s generally kept low. Anticipated rate of population growth, including feasible shifts in communities, industries, and commercial inceptions. Electric Motors and Pumps. Design life means the rock bottom span of a structure that is predicted to last.

Design 52
article thumbnail

More about design drawings and model planning

Construction Cost Estimating

Generally this process of making plans and producing them is known as technical drawing and a working drawing is a kind of technical drawing where documentation has to be done to build any engineering product or architecture such as civil, architectural, structural, mechanical, electrical and plumbing etc. and many more.

article thumbnail

Race to the Top

Buisness Facilities Contributed Content

Dennis Poon, vice chairman of the Thornton Tomasetti architectural firm and chief structural engineer of some of Asia’s tallest buildings, told The New York Times that Zhang’s design is feasible but has significant drawbacks. Then the prefabricated unit is quickly slipped into the rising tower and secured into place.