Remove en about-high-range-water-reducers
article thumbnail

Tackling high-rise concrete construction challenges

GCP Applied Technologies

Tackling high-rise concrete construction challenges. concrete / mix design / high rises. As architects design new high-rise buildings taller and with more complexity, producers are challenged to deliver ready-mix concrete that can be pumped, placed, and finished effectively for these structures. michael.delros…. June 09, 2020.

Concrete 125
article thumbnail

Tackling high-rise concrete construction challenges

GCP Applied Technologies

Tackling high-rise concrete construction challenges. concrete / mix design / high rises. As architects design new high-rise buildings taller and with more complexity, producers are challenged to deliver ready-mix concrete that can be pumped, placed, and finished effectively for these structures. michael.delros…. June 09, 2020.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Tackling high-rise concrete construction challenges

GCP Applied Technologies

Tackling high-rise concrete construction challenges. concrete / mix design / high rises. As architects design new high-rise buildings taller and with more complexity, producers are challenged to deliver ready-mix concrete that can be pumped, placed, and finished effectively for these structures. michael.delros…. June 09, 2020.

article thumbnail

8 Best Ear Protection for High-Frequency Noise

Work Gearz

Most noise from industrial or construction worksites can be measured within the range of human hearing and specifically between 20 and 20,000 Hertz. Some machinery, however, may produce sounds in the extreme upper limits such as a high-frequency piercing sound from an ultrasonic welder. Most ear protectors are tested to about 8,000 Hz.

article thumbnail

How To Reduce Risk On Construction Projects

ProcurementExpress.com

That may mean projects are not sufficiently funded to ensure a high-quality outcome or to withstand surprises that result in added costs and slimmer margins. If the AC is too cold in a room, hot water is sent through the coils in the air duct to bring the room temperature back into the desired range. Underbid projects.

Risk 52
article thumbnail

How To Reduce Risk On Construction Projects

ProcurementExpress.com

That may mean projects are not sufficiently funded to ensure a high-quality outcome or to withstand surprises that result in added costs and slimmer margins. If the AC is too cold in a room, hot water is sent through the coils in the air duct to bring the room temperature back into the desired range. Underbid projects.

Risk 40
article thumbnail

Building for infrastructure durability

Construction Specifier

This leaves contractors and engineers with the job of constructing buildings that will last for many decades, in spite of exposure to harsh climate, soil, and water conditions. the frequent freeze-thaw cycles (freeze-thaw is included in EN 206-1 but is omitted from IS 118 because cold weather almost never occurs in Israel).