Remove Estimating Remove Foundation Remove Materials Remove Project Management
article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

There are four phases of project management which are required to manage projects efficiently on quality, time and costs. Defining and organizing the project: Defining project is the first step in the project management process.

article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

The problem areas, effects in foundation and defects in structure due to those causes are presented here. The problem areas, effects in foundation and defects in structure due to those causes are presented here. There can be many causes for these defects.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

WHAT IS PROJECT MANAGEMENT?

The Constructor

WHAT IS PROJECT MANAGEMENT? Tweet A project is a set of interrelated activities, usually involving a group of people working together toward a common goal or objective over a period of time. Not surprisingly, project management requires strong organizational, budgeting, staffing, controlling, and communication skills.

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Preparation of Surface: The bed on which rubble soling is to be laid should be cleared of all loose materials, leveled, watered and compacted before laying rubble soling. Sun, 30 Sep 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.

article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

Three-Phases to Design-Build Construction: Preliminary Design and Estimating Detailed Construction Drawings and Bidding Construction Step One/Phase I – Preliminary Design and Estimating In this First Step or Phase our Architect develops plans based on a needs analysis meeting with the building owner and representatives for a nominal fee.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Timber: This is the most common material used for bracing members to the form face. Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. It is easily cut to shape on site, and if handled and stored carefully, it can be used many times.

Materials 136