Remove Fabrication Remove Guidelines Remove Inspections Remove Sewer
article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

ADAAG: Americans with Disabilities Act Architectural Guidelines. CISP: Cast Iron Soil/sewer Pipe. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. INSP: Inspect. VF: Vinyl Fabric. WWF: Welded Wire Fabric. ACR: Acrylic. ACST: Acoustic. ACT: Acoustical Tile; Actual. ADD: Addendum; Addition.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ADAAG: Americans with Disabilities Act Architectural Guidelines. CISP: Cast Iron Soil/sewer Pipe. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. INSP: Inspect. VF: Vinyl Fabric. WWF: Welded Wire Fabric. ACST: Acoustic. ACT: Acoustical Tile; Actual. AD: Access Door, Area Drain. VIN: Vinyl.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ADAAG: Americans with Disabilities Act Architectural Guidelines. CISP: Cast Iron Soil/sewer Pipe. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. INSP: Inspect. VF: Vinyl Fabric. WWF: Welded Wire Fabric. ACST: Acoustic. ACT: Acoustical Tile; Actual. AD: Access Door, Area Drain. VIN: Vinyl.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. In addition to the qualifying expenses, at least 25% of the workforce on every project must be Colorado residents in order for the project to meet state incentive guidelines.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. In addition to the qualifying expenses, at least 25 percent of the workforce on every project must be Colorado residents in order for the project to meet state incentive guidelines. SALES TAX INCENTIVES. BUSINESS TAX CREDITS.

Income 75