Remove Fabrication Remove Infrastructure Remove Negotiation Remove Visualization
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

As we detailed in our March/April 2012 cover story, Baton Rouge (known as the Creative Capital of the South) has attracted development studios including Electronic Arts, Firebrand Games, Crawfish Games and the international Academy Award-winning visual effects studio Pixomondo. With its proximity to the center of the U.S.

Metro 110
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Grants are available for Proof of Concept, Early-Stage Capital & Retention, Infrastructure Funding and AI Exports. ALABAMA - updated for 2014.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. IDBs can be issued by the California Infrastructure & Economic Development Bank (I-Bank), cities, counties and joint powers authorities and do not constitute an obligation of either the state or the local government issuer.

Income 75
article thumbnail

FEATURE STORY: Nothing Matters More Than Talent

Buisness Facilities Contributed Content

The structure will have appropriate infrastructure to support these activities with substantial outdoor areas for testing in a variety of environments. The time is right for Airbus to expand in America,” said Fabrice Brégier, Airbus President & CEO at the announcement in Mobile. Airbus is the largest export customer for the U.S.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site and Infrastructure Subgroup: Divisions 30 – 39. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 43 19 Fabricator Qualifications.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Site and Infrastructure Subgroup: Divisions 30 – 39. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 43 19 Fabricator Qualifications.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

o Basic Requirements o Infrastructure. o Planning o Infrastructure Systems. Demonstrate knowledge and ability to repair all HVAC Systems (calibrate, change, fabricate, recover, replace and trouble shoot as required…). Demonstrate the ability to work with Facilities team to negotiate rates and discounts.