article thumbnail

Green Home Building and Sustainable Architecture: Affordable Eco.

Natural Building

Participating in the debate about new planning regulations to ensure that eco-building is permissible. Using pre-fabricated elements or existing structures. Planning favours buildings which conform to existing styles and norms and building regulations need to be negotiated. Careful choice of materials.

Green 61
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

1000 pound thrust; and Investments into new local capabilities including design, fabrication, and remote hot fire test capabilities for “Green” propulsion systems. Moon Express will benefit from the proximity to the NASA Marshall Space Flight Center and the historic Redstone Arsenal. NOLA, MEMPHIS ARE LOGISTICS LEADERS.

Metro 110
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Contractor shall furnish as part of its overhead cost, included in the coefficient, all necessary protective equipment, concrete mixing boxes, water barrels, wheelbarrows, hoes, shovels, tools, mortar boards, ladders, portable scaffolding, shop tools, hand tools, shop equipment, and fabricating items customary to the trade, etc.,

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

To receive an abatement for property taxes, a project must meet certain qualifications and follow certain procedures, as determined by law and regulation. To receive abatement for any or all of these taxes, a project must meet certain qualifications and follow certain procedures, as determined by law and regulation.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

Lenders negotiate their own fees and the USDA charges 2 percent of the guaranteed amount as a one-time fee. HIGH IMPACT PERFORMANCE INCENTIVE GRANT (HIPI): A negotiated grant provided to pre-approved applicants in certain high-impact sectors designated by the Governor’s Office of Tourism, Trade and Economic Development (OTTED).

Income 75