article thumbnail

Seven Projects Land Deal of the Year Honorable Mentions

Buisness Facilities Contributed Content

The Polaris manufacturing facility will support core processes including vehicle assembly, chassis and body painting, welding, fabrication, and injection molding. Having an adequate sewer infrastructure, including a water pretreatment facility capable of processing high concentrations of effluents, was mandatory for the project.

Deals 40
article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CISP: Cast Iron Soil/sewer Pipe. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. RR: Railroad. VF: Vinyl Fabric. WWF: Welded Wire Fabric. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Sewer Lines, Sewage Treatment Facilities. Railroad Spurs. For a list of state economic development agencies, click this link. Natural Gas-Line Services.

Income 108
article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CISP: Cast Iron Soil/sewer Pipe. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. RR: Railroad. VF: Vinyl Fabric. WWF: Welded Wire Fabric. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CISP: Cast Iron Soil/sewer Pipe. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. RR: Railroad. VF: Vinyl Fabric. WWF: Welded Wire Fabric. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. 05 01 50 Maintenance of Metal Fabrications. 05 06 50 Schedules for Metal Fabrications.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

01 43 19 Fabricator Qualifications. 03 22 00 Fabric and Grid Reinforcing. 03 22 13 Galvanized Welded Wire Fabric Reinforcing. 03 22 16 Epoxy-Coated Welded Wire Fabric Reinforcing. 04 43 16 Stone Fabrications. 05 01 50 Maintenance of Metal Fabrications. 05 06 50 Schedules for Metal Fabrications.