Remove Foundation Remove Inspections Remove Risk Remove Schedule
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

The problem areas, effects in foundation and defects in structure due to those causes are presented here. The problem areas, effects in foundation and defects in structure due to those causes are presented here. Insufficient width of foundation Settlement of foundation occurs due to insufficient distribution of load.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Rubble Stone Soling: The rubble stone generally used are of best variety of black trap / granite / basalt or other variety of stone available locally. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) 2) The axial lines (center lines) of the trenches are marked with the help of profiles, sighting rails, strings and pegs. (3)

article thumbnail

Achieving project success through product and material testing

Construction Specifier

The construction industry faces a myriad of challenges, such as completing projects on schedule, ensuring the quality and safety of products and materials, overseeing the costs so they do not exceed the budget, and complying with corporate environmental and social responsibility standards; all while applying effective risk management at every step.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

In this phase you assemble your team and assign tasks to individuals, develop a budget for the project, develop a schedule and create a communications plan. Team members monitor and control progress in terms of cost, time, and quality; and manage risk.

article thumbnail

Project Foundation Pt. 2: Building the Master Budget

Stok

The foundation for any successful project is a detailed schedule and budget. stok’s Project Managers first shared tips for creating an accurate Master Schedule. Special inspections allowance. These are funds in the master budget set aside to cover risk and uncertainly. The post Project Foundation Pt.