Remove Guidelines Remove Inspections Remove Overhead Remove Subcontracting
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at. The UPB costs should NOT include contractor overhead and profit. The contractor typically bears overhead costs as part of the proposed coefficient of the JOC program.

Contract 100
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Order Contracting GUIDELINES & PROCEDURES. The Owner reserves the right to inspect such off- site work at any. Subcontracts. At the completion of the project, any savings associated with the Subcontract may be required to be passed along to the Order by way of a change order. . JOB ORDER CONTRACTING.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

Implementing guidelines are set forth in FAR Subpart 16.5. The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions.