What are Independent Government Estimates – IGEs?

Building Information Management

This means the estimate should include (1) the direct costs incident to the construction; (2) an allowance for indirect or overhead costs; and (3) an allowance for a reasonable amount of profit. This price would include the cost of cement, aggregate, reinforcing steel and forms, but it usually excludes all overhead and profit.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Government and commercial software is available for localization and for compiling task listings and unit prices. Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. TO negotiation. Coefficients. Purpose of the SABER Program.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

General Overview - Construction Cost Estimating Blog

Construction Cost Estimating

Under IAS 11, if a contract addresses two or more assets, the construction of each asset reported for individually if (a) separate proposals were submitted for each asset, (b) portions of the contract regarding each asset were negotiated independently, and (c) costs and revenues of each asset can be evaluated. IAS 11.10]. of the various i.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. These contracts have much of their pricing determined by pre-award competition.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

o Determine costs/pricing structure (labor, materials, overhead, etc.). Demonstrate the ability to work with Facilities team to negotiate rates and discounts. Demonstrate knowledge of permit system for hot welding work and for confined space work. o Obtain any required project permits. o Establish close-­?out

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 31 43 Permit Application. 00 31 46 Permits. design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 31 43 Permit Application.