Remove Overhead Remove Profitability Remove Security Remove White Paper
article thumbnail

What is a JOC Unit Price Book

Job Order Contracting

The reason is that the OpenJOC UPB is locally research and does not include contractor overhead and profit. Note: Example of multiple JOC co-efficients-Normal work hour adjustment factor, Nighttime work adjustment factor, Weekend work adjustment factor – work conducted, Secure area adjustment factor.). via 4BT.US contact-form].

Overhead 100
article thumbnail

Job Order Contracting – JOC – Best Management Practices

Building Information Management

A reasonable profit, quality, and projects complete on-time and on-budge, and long term relationships are the goal. There are multiple case studies, white papers, and research documents. Bare costs do not include contractor’s overhead(s) and profit. Joint site walks and scoping common. Annual volume. Competition.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Cost Estimating Software vs. Spreadsheets – State of the Nation 2012

Building Information Management

Construction estimating involves the estimating of material, labor, equipment, overhead/profit and contingencies. Growing numbers of cost estimators now have the need to work with multiple projects, multiple estimates, and multiple contracts (IDIQ, JOC, SABER…) simultaneously and securely.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

A single award ID/IQ contract often makes it difficult for the government to secure the same price reductions and contractor performance improvements that would occur if the contractor was competing against other qualified contractors throughout the contract. These contracts have much of their pricing determined by pre-award competition.