article thumbnail

Rooftop stormwater management technologies climate change adaptation and resilience

Construction Specifier

of rain over 24 hours in Sacramento and 102 mm (4 in.) Urban centers have high concentrations of impervious areas and outdated sewer infrastructures, which post a challenge in managing stormwater during extreme rainstorms. Large volumes of stormwater can also lead to combined sewer overflow in older cities across the U.S.,

article thumbnail

Rooftop stormwater management technologies climate change adaptation and resilience

Construction Specifier

of rain over 24 hours in Sacramento and 102 mm (4 in.). Urban centers have high concentrations of impervious areas and outdated sewer infrastructures, which post a challenge in managing stormwater during extreme rainstorms. Large volume of stormwater can also lead to combined sewer overflow in older cities across the U.S.,

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Heroic Efforts In California

Buisness Facilities Contributed Content

Encompassing over 111 square miles, Hesperia’s sphere of influence extends to hundreds of industrial/commercially-zoned acres along the desirable north-south frontage of Interstate 15. Five parcels, all under a single ownership, encompass 225+/- acres zoned as Commercial/ Industrial Business Park. Sited along Interstate 15 and U.S.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone. ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. CALIFORNIA.

Income 75
article thumbnail

Industry Focus: Food Processing – The Process Of Consistency

Business Facilities

As a designated Foreign Trade Zone (FTZ), Oswego County is designed for the convenient and cost effective production of goods. All preliminary work such as extending utilities, rail, water and sewer is complete at both sites which are “ready to go and ready to market.”. Many food processing facilities require water for processing.