Remove 2001 Remove BIM Remove Education Remove Environment
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Friday: BIM Academic Education Symposium.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Friday: BIM Academic Education Symposium.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. For instance, if a client wants higher return for investment , value management is introduced to determine the kind of project that will provide to the client the expected return on investment (Kelly and Male, 2001).

article thumbnail

Productive Construction – Traits of Collaboration

Job Order Contracting

productive environment. How To Measure the Benefits of BIM: A Case Study Approach. The International Journal of Engineering Education, 19, 777-787. The key performance indicators of the BIM implementation process. Productive construction and collaboration go hand in hand. The traits of collaboration include: co-location.

Products 200
article thumbnail

A Robust Framework for Improving Construction Productivity

Job Order Contracting

The core components of Integrated Project Delivery (IPD), for major construction, and LEAN Job Order Contracting (JOC), for repair, renovation, maintenance, and minor new builds, are now available within frameworks that include support services, information environments, and enabling collaborative technologies. doi: [link] Barlish, K.

Products 149
article thumbnail

Navistar Makes U-Turn on Diesel Engines, Arrives at Cummins.

ENR Construction

Environment. Earn Continuing Education Credits. based Navistar, which had been bullish about exhaust-gas-recirculation , or EGR, its in-cylinder technology worth about $700 million in development costs since 2001. ENR Subscriber Login ». -->. -->. ENR subscriber login » -->. SUBSCRIBE TODAY & receive immediate web access.