article thumbnail

Maryland Bans Polystyrene and Enacts 31 other New Environmental Laws

Green Building Law Update

Solid Waste Management. Maryland’s Renewable Portfolio Standard was enacted in 2004 to facilitate a transition to renewable sources of energy. Water Quality and Land Management. Stormwater and Flood Management. Water and Sewer Services. Clean Energy Jobs.

Maryland 120
article thumbnail

U.S. Construction – Improving Efficiency & Competitiveness

Building Information Management

Studies document 25 to 50 percent waste in coordinating construction labor and in managing, moving, and installing materials (Tulacz and Armistead, 2007); losses of $15.6 Studies document 25 to 50 percent waste in coordinating construction labor and in managing, moving, and installing materials (Tulacz and Armistead, 2007); losses of $15.6

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Contractors Should Consider Hiring Us Over A Bookkeeper

Contractor Bookkeeping

No additional utility costs for heat, ventilation, air conditioning, lights, water, sewer and garbage. In 2004 Our Co-Founder Randal DeHart - Passed the PMP (Project Management Professional) exam after several years of construction project management experience and with an emphasis on systems engineering and process development.

US 48
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 41 23 Bid Form – Construction Management (Single-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat 2004 (and subsequent updates) is now composed of up to 8 digits (though many have expanded to 12+ digits) and 50 divisions at Level 1, “Sections” within each division, as well as four standard levels, and a user-defined fifth level. 2004+ Edition. 00 41 23 Bid Form – Construction Management (Single-Prime Contract).