Public Procurement of Construction Services
Job Order Contracting
MARCH 28, 2024
References: AIA (2007). References: AIA (2007). Integrated Project Delivery: A Guide.” The American Institute of Architects (AIA), Washington, DC AGC (2010). A Case Study of Children’s Hospital, Bellevue, WA.”, Lean Construction Journal Lee, H.W., Anderson, S., and Ballard, G. Matthews, O., and Howell, G.
Let's personalize your content