article thumbnail

FEMA Recommends I-Codes For National Flood Insurance Program

Buisness Facilities Contributed Content

A Federal Emergency Management Agency (FEMA) National Flood Insurance Program (NFIP) flood plain management report says current model building codes, such as the International Codes (I-Codes), have flood provisions that are consistent with NFIP requirements for buildings and structures. Posted by Heidi Schwartz.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

INSURANCE |. These men and women set the bar high for their teams, but not so high that the end goal is not feasible. This entry was posted on Thursday, March 29th, 2012 at 3:49 pm and is filed under John Chaney Blog. 4 Responses to “Lessons in Construction Leadership” Melisa Says: March 30th, 2012 at 9:12 am.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Business Owner Blogs

Construction Business Owner

INSURANCE |. While it would be great to reinstate everyone and everything in the name of leadership, it isn’t feasible. This entry was posted on Thursday, February 2nd, 2012 at 2:55 pm and is filed under John Chaney Blog. August 2012. April 2012. March 2012. February 2012. January 2012.

article thumbnail

DebunkTheBIM: ?We looked around in the market and found nothing.

DebunkTheBIM

I wrote previously how I could not see ‘backyard’ or even professional-but-small-scale program writing feasible anymore and that the baseline expectation of a ‘standard’ user of any digital tool is so high that customisation of mainstream, off-the shelf products should be considered first. ► 2012. (49).

BIM 48
article thumbnail

The role of quantity surveyor for construction project

Construction Cost Estimating

After construction being completed the quantity surveyor may be utilized for other work like ax depreciation schedules, replacement cost estimation for insurance purposes and, if required, mediation and arbitration. The quantity surveyors facilitate owners to attain his requirements at feasibility stage in most cost-effective way.

article thumbnail

Construction Cost Estimating Blog: Some exclusive software for.

Construction Cost Estimating

Saturday, February 18, 2012. D4COST is a professional preliminary cost estimating system useful for preliminary, conceptual design development square foot cost estimates as well as cost feasibility, valuation study, or budget. ▼ 2012. (18). Construction Cost Estimating Blog. adsense analytic. Blog Archive. ► June. (4).

article thumbnail

Construction Cost Estimating Blog: Related Costs of a built.

Construction Cost Estimating

The operation and maintenance cost over the project life cycle for succeeding years should comprise of relevant land rent, Labor and material for maintenance and repairs, cyclic renovations, Insurance and taxes, Financing costs, Utilities, Operating staff, Owners other expenses. ► 2012. (18). Blog Archive. ► June. (4).