Remove 2015 Remove Airports Remove Fabrication Remove Union
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

The office building is scheduled for completion by spring 2015 with the residential complex following in the summer. 1000 pound thrust; and Investments into new local capabilities including design, fabrication, and remote hot fire test capabilities for “Green” propulsion systems. and other free-market proponents.

Metro 110
article thumbnail

Global Growth Surge in Southwest Louisiana

Business Facilities

The southwest side of Louisiana is in a strategic location with access to ports, airports, rail, the Intercoastal Canal, and America’s premier pipeline that helps to deliver industrial products across the country,” he said. The parish has a Municipal Airport with a 5,000 foot instrument landing runway capable of handling a 737 aircraft.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Centers of Technology: The Future Is Now

Business Facilities

DMDII has kicked off some major programs since the institute opened in 2015. Top sectors include computer electronics, health and medical devices, and fabricated metals and heavy machinery. The program has helped foster growth in dozens of startup companies, such as Agcore Technologies, since it was introduced in 2015.

article thumbnail

Heroic Efforts In California

Buisness Facilities Contributed Content

The Murrieta Innovation Center celebrated its grand opening with a well-attended ceremonial ribbon cutting in June 2015. All industrial parks offer easy freeway access and are located within five to 15 minutes of either the airport or the seaport. Credit: Shane Gibson). Murrieta is ideally located at the intersection of U.S.

article thumbnail

COVER STORY: Editors’ Location Picks

Buisness Facilities Contributed Content

After more than 18 years of planning, work finally began in late January on a new, 8,000-foot-long runway at Fort Lauderdale-Hollywood International Airport. Runway 9R-27L, located on the south side of the airport and running parallel to Griffin Road, is now being rehabilitated and lengthened. million passengers annually.

Omaha 76
article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

Her MSc studies in Construction Project management have reinforced her strategic thought process in delivering above expectation and her understanding and importance of DfMA (pre-fabrication). His first job included hands-on labor for an architectural sheet metal fabrication company.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Effective for facilities placed into service between January 1, 2011 and December 31, 2015. In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport. Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. in 2015 0.0

Income 108