Remove 2015 Remove BIM Remove Change Orders Remove Modeling
article thumbnail

Is a BIM Mandate Coming to the US?

Viewpoint Construction Technology

As we discussed in a recent blog post , the JBKnowledge 2017 Construction Technology report found that building information modeling (BIM) adoption in the United States has been fairly slow, with only 27 percent of construction companies having a BIM department. So will the United States ever have a BIM mandate?

BIM 200
article thumbnail

#117:  Building Information Modeling

NH Construction Law

Over the past decade, Building Information Modeling (“BIM”) – computerized 3D portrayal of integrated building elements that allows a project or project subset to be built virtually before being built in the field – has become prolific in commercial construction. This is not your father’s CAD system.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM 2015 Reader Survey - Standard Form Documents, Execution Plans and COBie - What's Your Experience?

Construction Dive

Have you encountered or used building information modeling (BIM) on any of your projects? Are you interested in BIM but don''t know where to begin? BIM seems to highly regarded by those who have made the transition. But BIM may not be suited for all projects, or all construction professionals.

BIM 48
article thumbnail

OpenJOC – LEAN Construction Delivery / Job Order Contracting

Job Order Contracting

Thus, properly deveolped Job Order Contracts have documented processes that support early and ongoing sharing of project work scope, detailed costs, and other required information, and remove the ‘ad hoc’ methods, misinformation, distrust, delays, and change orders associated with traditional construction delivery methods.

Contract 100
article thumbnail

Construction Cost Management 101

Autodesk Construction Cloud

This can affect everything from the bidding process to change order management, your team’s efficiency, and ultimately, your bottom line. Effective cost management sets the standard for all project costs and affects all phases of a project including planning, design, estimation, change orders, and specialty contractors.

article thumbnail

Manage Changes, Don’t Let Them Manage You

Autodesk Construction Cloud

The Design Collaboration module in Autodesk BIM Collaborate offers the Change Analysis tool, which enables users to understand the design changes incurred on their projects. Teams can establish watch groups to closely monitor changes, configurable based on user criteria.

article thumbnail

Job Order Contracting – 2015

Building Information Management

Reduced legal fees, and virtual elimination of change orders. Elimination of change orders. References: A Path Toward Construction Productivity – Academia.edu, July 2015. Emerging Technology Cloud Computing and BIM – American Military Engineers SAME TME, Pg. Integrated Order Contracting , pg.