Remove 2016 Remove Airports Remove Commissioning Remove Roads
article thumbnail

Logistics: On the Road, Water or Rails…or in the Air — AGAIN

Business Facilities

By Dominique Cantelme From the May/June 2016 Issue. In addition, Brunswick County is one of the localities that receive economic development support from the Tobacco Region Revitalization Commission. Midwest Airports. Currently, O’Hare International Airport is ranked #6 in the nation in cargo coming through the airport with 4.6

Roads 41
article thumbnail

Steel Bar Processor Investing $36.9 Million to Locate in Porter County

Buisness Facilities Contributed Content

million to develop a greenfield site at the Airport Industrial Park in Valparaiso. As part of processing, the steel will go through cleaning, drawing, cutting, straightening, testing and bundling before being shipped to automotive, agricultural, off-road equipment, hydraulic and tool making customers. “We

Indiana 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Steel Bar Processor Investing $36.9 Million to Locate in Porter County

Buisness Facilities Contributed Content

million to develop a greenfield site at the Airport Industrial Park in Valparaiso. As part of processing, the steel will go through cleaning, drawing, cutting, straightening, testing and bundling before being shipped to automotive, agricultural, off-road equipment, hydraulic and tool making customers. “We

Indiana 40
article thumbnail

A Connected BIM Approach Helping to Achieve High Levels of Productivity for the Anel Group

Autodesk Construction Cloud

This solution package, which includes an integrated BIM toolkit and is designed for the building industry, has also played a pivotal role in Anel Group’s international expansion efforts since 2016. Our initial move was to create a BIM Commission that would include representatives from all departments.

BIM 52
article thumbnail

COVER STORY: Editors’ Location Picks

Buisness Facilities Contributed Content

After more than 18 years of planning, work finally began in late January on a new, 8,000-foot-long runway at Fort Lauderdale-Hollywood International Airport. Runway 9R-27L, located on the south side of the airport and running parallel to Griffin Road, is now being rehabilitated and lengthened. million passengers annually.

Omaha 76
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Special Project Procedures for Airport Facilities. 01 55 13 Temporary Access Roads. 01 55 23 Temporary Roads. Special Project Procedures for Airport Facilities. 01 55 13 Temporary Access Roads. 01 55 23 Temporary Roads. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Special Project Procedures for Airport Facilities. 01 55 13 Temporary Access Roads. 01 55 23 Temporary Roads. Special Project Procedures for Airport Facilities. 01 55 13 Temporary Access Roads. 01 55 23 Temporary Roads. 01 91 00 Commissioning. 01 91 13 General Commissioning Requirements.