article thumbnail

Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

Consistent delivery of quality repair, renovation, maintenance, and new build projects on time and on budget is possible using an integrated planning, procurement, and project delivery solution. The post Integrated Construction Planning, Procurement, and Project Delivery Solution appeared first on 4BT. Team Selection. 4170.000042.

article thumbnail

Construction Equation: Knowledge Problems + Data Problems + Management Problems = Outcome Problems

Job Order Contracting

Lack of recognition by senior management of the linkage between between the built environment and organizational mission Low level of understanding of both life-cycle total-cost-of-ownership management and integrated lean planning, procurement, and project delivery principles and processes. Procurement of built assets.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEAN Construction Delivery, The Primary Challenge to BIM

Job Order Contracting

The solution to improved life-cycle management of the build environment lies within a greater focus upon improving competencies and business processes. Asset Total Cost of Ownership-Efficient Life-cycle Management Model. JOC Performance – 2016 Industry Study . IntegratedOrderContractingSAME.

BIM 100
article thumbnail

U.K. BIM has the same Issues as the U.S.

Building Information Management

.’s AEC sector is impeding BIM (efficient life-cycle management of the built environment), just as it has in the U.S. This report strikes at the heart of the complex dynamics surrounding these issues and points the way towards a more collaborative future,” (Source – Out-law.com, 2016). and the U.K.

BIM 40
article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

2016, Arizona State University – Job Order Contracting Performance Survey-2015. Educational and training programs must focus upon asset life-cycle management and modeling. Overall focus must shift from first-cost mentality to life-cycle/total-cost-of-ownership. Shorter procurement times.

article thumbnail

Achieving Best Value for Facility Renovation, Repair, Maintenance, and Construction – 2016 and Beyond

Building Information Management

As one might anticipate lack of education, awareness, and capability, with respect to life cycle management of the built environment and/or total cost of ownership management, are the primary causal factors, as well as, resistance to change which is endemic to the sector as a whole. EU public procurement law. BREEAM, (n.d.).

article thumbnail

Why Efficient Facility Management Is So Difficult

Building Information Management

Senior level management and all facilities, procurement, planning, and engineering/architecture/construction professionals must work in an environment that is collaborative, transparency, and prior business process are challenged and continuously improved. Focus is upon best value and life-cycle costs versus first costs.