Remove 2017 Remove Contract Remove Leases Remove Office
article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

Key FY 2017 Statistics. Billion – Annual Operation Costs $7.92 – Average O&M Costs per Square Foot $27.49 – Average Lease Costs per Square Foot. Lease costs for leased assets are comprised of two sub elements: lease annual rent to lessor and lease annual operating and maintenance costs.

Leases 100
article thumbnail

Blockchain has come to U.S. Real Estate

Green Building Law Update

Bitcoin or other) exchange in a business transaction undertaken with a smart contract stored over the peer to peer network that is blockchain. Actually, the first deed in In California, was apparently recorded by Propy on a blockchain transaction in May and the San Francisco Recording office holds a deed containing blockchain information (.

Vermont 136
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

The remainder of the code is the substantive content that is the 2017 edition of ANSI/ASHRAE/ICC/USGBC Standard 189.1 Note, the 2017 edition of Standard 189.1 Note, the 2017 edition of Standard 189.1 be aware the American Institute of Architects dropped out of the secret society was not a party to the final code release?).

Green 156
article thumbnail

Logistics: On the Road, Water or Rails…or in the Air — AGAIN

Business Facilities

To meet demand, rails increased capacity with 1,300 new and rebuilt locomotives; 3,800 freight car purchases; and 700 new leased freight carts. Positive absorption remains in all industrial submarkets in DuPage County, showing continued strength and growth in the county in leasing, user sales and construction completions.

Roads 41
article thumbnail

FEATURE STORY: 2014 Economic Development Awards

Buisness Facilities Contributed Content

Certain types of businesses are excluded from the program, including retail and wholesale businesses; restaurants and hospitality; professional practices like law firms and medical offices; and energy production and distribution companies. Texas Governor’s Office. Any other fuel that is produced from a renewable or sustainable source.

Indiana 108
article thumbnail

Advanced Manufacturing: Manufacturing Gets Smarter, Faster

Business Facilities

From the September/October 2017 Issue. Here’s a peek at what’s driving change in 2017: The factory of the future: Tesla’s “Gigafactory,” may represent not just what future factories look like, but how companies approach their entire manufacturing process. The program boasts 225 member companies and 650 students enrolled for fall 2017.

article thumbnail

2018 IgCC – A Fast Paced Deep Dive

Green Building Law Update

The remainder of the code is the substantive content that is the 2017 edition of ANSI/ASHRAE/ICC/USGBC Standard 189.1 Note, the 2017 edition of Standard 189.1 prescribing “not less than 50% of the floor area shall be in the daylight area” that is problematic for large building floorplate size not to mention for private offices.

Green 136