Remove Accounting Remove CAD Remove Feasibility Remove Modeling
article thumbnail

Level Up Design and Coordination Workflows with Accessible Reality CaptureĀ 

Autodesk Construction Cloud

For starters, you’re dealing with an old structure without CAD files and limited documentation. Thanks to lower hardware costs and direct connections between tools, the process of creating usable 3D models from photos or laser scans is easier than ever. It’s an exciting project, but it also comes with a host of challenges.

Design 119
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

When feasible the position of valves, air pressure, temperature, or water level being monitored should be altered to actuate the signals. When it is both feasible and safe, the environmental conditions being monitored should be altered to actuate the device. Account for all tools, materials, and equipment before closing boiler.