The Future Of Construction – BIM
Lets Build
MAY 9, 2017
In this phase, the production and sharing of the information are taking place with the help of paper and non-interoperable electronic documents. CAD drawings are used during Level 0, but there is no sharing of the generated information models. A Common Data Environment (CDE) is used in this case. BIM Level 3 (Full Integration).
Let's personalize your content