article thumbnail

The Future Of Construction – BIM

Lets Build

In this phase, the production and sharing of the information are taking place with the help of paper and non-interoperable electronic documents. CAD drawings are used during Level 0, but there is no sharing of the generated information models. Softwares like Aconex or Viewpoint can be used as the CDE.

BIM 168
article thumbnail

Don’t shoot for Paperless – Go Drawingless!

DebunkTheBIM

It is the ‘drawing based’ approach that is causing us trouble. Drawing based is centred on the ‘projection technique’ (i.e. orthogonal projection – what 2D technical drawings are ‘made’ from) a risky solution that requires high level of skills from the operators. Look up my post on the PictureBook Documenting.

Aconex 48