What Is a Change Order?

Autodesk Construction Cloud

What Is a Construction Change Order? According to some estimates, an average of 35% of projects experience at least one major change throughout the life of the project. As a contractor, change orders can leave you feeling like you’re trapped between a rock and a hard place. Key Takeaways.

article thumbnail

#117:  Building Information Modeling

NH Construction Law

Over the past decade, Building Information Modeling (“BIM”) – computerized 3D portrayal of integrated building elements that allows a project or project subset to be built virtually before being built in the field – has become prolific in commercial construction. This is not your father’s CAD system.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

4 No-Brainer Workflows with Autodesk Construction Cloud Connect 

Autodesk Construction Cloud

Fortunately, you can overcome these hurdles by using ACC Connect to sync drawings, field reports, and documents in the cloud. Using ACC Connect, you can integrate files and create custom workflows between SharePoint and Autodesk Build, Autodesk Docs, BIM 360, or PlanGrid. . 2: Project Management. 3: Contract Management.

Autodesk 105
article thumbnail

Job Order Contracting – 2015

Building Information Management

This relationship carries with it a strong motivation for the JOC contractor to provide outstanding service and quality work to receive additional work orders, because the amount of work being assigned by the facility owner or manager is based on the JOC contractor’s performance. Reduced legal fees, and virtual elimination of change orders.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 01 15 List of Drawing Sheets. Measured Drawing Information.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Demonstrate knowledge of Shared Savings Contracts, Power Purchase Agreements (PPA), Utility EnergyService Contracts (UESC) and Enhanced Use Leases (EUL). If Project will be completed by contractors, demonstrate the ability to: o Produce project change orders. approve project payments/draws. o Utility Financing.