Remove Agreement Remove CSI Remove Life Cycle Remove Security
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Greg Ceton has managed the development of Construction Specifications Institute’s (CSI) information standards and publications since November 2000. 3:30 – 4:15 PM BSI – Product Room.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Greg Ceton has managed the development of Construction Specifications Institute’s (CSI) information standards and publications since November 2000. 3:30 – 4:15 PM BSI – Product Room.

BIM 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Cost Estimating

Job Order Contracting

CSI Masterformat (TM) UPB format (50 Division) used for data organization. Compliant with advanced security protocols. Support and training from a team that has decades of experience LEAN consturction delivery and life-cycle facilities / infrastructure asset management. Security Features. Service Level Agreement.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 43 13 Bid Security Form. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 43 13 Bid Security Form. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 43 13 Bid Security Form. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 43 13 Bid Security Form. Requirements.