What is a JOC Unit Price Book

Job Order Contracting

The reason is that the OpenJOC UPB is locally research and does not include contractor overhead and profit. Note: Example of multiple JOC co-efficients-Normal work hour adjustment factor, Nighttime work adjustment factor, Weekend work adjustment factor – work conducted, Secure area adjustment factor.).

Overhead 100
article thumbnail

A Comparison of Construction Cost Estimating Software Tools 2015

Building Information Management

Growing numbers of cost estimators, however, need to work with multiple projects and multiple estimates simultaneously, securely share information on active projects, gain access to localized cost information, and easily locate and reuse historical data. Both of these approaches have merit and are well suited for certain types of users.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 43 13 Bid Security Form. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 43 13 Bid Security Form. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

MasterFormat was produced as a “first edition” in 1978 by Construction Specifications Canada and Construction Specifications Institute (CSI). 00 43 13 Bid Security Form. 00 52 00 Agreement Forms. 00 52 13 Agreement Form – Stipulated Sum (design/bid/build or. 00 43 13 Bid Security Form. Requirements.