Remove Airports Remove Architecture Remove Estimating Remove Materials
article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. km² platform. It is connected to the northern side of Lantau Island near Tung Chung new town.

Airports 203
article thumbnail

Construction Cost Estimator – Line Item

Job Order Contracting

Construction Cost Estimator – Line Item. A superior line item construction cost estimator generally has an intricate knowledge of field construction techniques, uses a common data environment, and is skilled at both collaboration and LEAN construction and/or facilities management. Transportation (Airports/Mass Transit).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates. It is easily cut to shape on site, and if handled and stored carefully, it can be used many times. Note the different thickness: A standard plywood thickness on site is 18mm.

Materials 136
article thumbnail

Young Artist Embraces Natural Building in Trinidad

Natural Building

Celine Ramjit is an artist working in eco-architecture, weaving; and tattooing. There are many advantages to working with clay as a building material; it is cost effective and abundant, highly durable, able to store and release heat. It is estimated that 1.5

article thumbnail

Subways in America

The Constructor

Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.

America 203
article thumbnail

Joint public-private sector effort needed to mitigate the construction sector’s embodied carbon problem

BD+C

Of those total emissions, building operations are responsible for 27% of annual global emissions, while embodied carbon emissions—the greenhouse gas emissions generated from the manufacturing, transportation, installation, maintenance, and disposal of building materials—are responsible for 15% of annual GHG emissions.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Organizing projects means defining roles and responsibilities, create a project charter, and develop high-level time and cost estimates. Mon, 1 Oct 2012 About Jobs Connect Groups Forums Toolbar SMS Alerts RSS Feed Search The Constructor Subscribe by E-Mail to receive latest updates.