Remove Airports Remove Commercial Remove Negotiation Remove Sewer
article thumbnail

State Focus – Indiana: Regional Plans Are Hopping In The Hoosier State

Buisness Facilities Contributed Content

Together, the utilities participate in business negotiations from the start to determine how the utility can “sweeten the deal” when needed. Southern Indiana supports business air transport from three locations: Louisville International Airport with a UPS Worldport, Louisville’s largest employer, with its own control tower.

Indiana 40
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Alabama Infrastructure Grant Program: Funds are available to public entities for extension of water, sewer and road facilities to service new or expanding industries. Alabama Economic Development Loan Program: The state has more than 2,300 commercial lending sources with assets of over $61.3 Currently there are two MRZs in Arizona.

Income 108
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

ALABAMA INFRASTRUCTURE GRANT PROGRAM: Funds are available for extension of water, sewer and road facilities. ALABAMA ECONOMIC DEVELOPMENT LOAN PROGRAM: The state has more than 2,300 commercial lending sources with assets of over $61.3 Loans may be made for working capital, equipment, construction or other commercial purposes.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Special Project Procedures for Airport Facilities. Requirements. 00 01 07 Seals Page.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Special Project Procedures for Airport Facilities. Requirements. 00 01 07 Seals Page.