INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

article thumbnail

Job Order Contracting – The Legal Side

Building Information Management

This is NOT intended as ANY form of legal advice or counsel, but simply to share information relative to efficient construction project delivery methods. FACILITIES CONSTRUCTION CVF JOB ORDER CONTRACTS (LEGAL) DATE ISSUED: 10/9/2013 1 of 3 UPDATE 98 CVF(LEGAL)-P. source: [link]. Magnolia ISD 170906. Gov’t Code 2269.401.

Legal 520
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

And How to Avoid Construction Errors and Mistakes Altogether. When it comes to large construction projects, the last thing a contractor wants to deal with is a costly mistake that will cause them to absorb the repair costs into their budgets. Silver Line Metrorail project leading to the Dulles International Airport. In the D.C.

article thumbnail

How Autodesk Build Enables EuroAirport to Manage its Assets Digitally

Autodesk Construction Cloud

By using Autodesk Build , an Autodesk Construction Cloud solution, the French-Swiss airport Basel-Mulhouse-Freiburg can now save 360 days of worker hours when planning its equipment maintenance. In an airport, runway maintenance work is carried out at night. The stats for EuroAirport Basel-Mulhouse-Freiburg are dizzying.

article thumbnail

METHODS OF BRIDGE CONSTRUCTION

The Constructor

Following are the methods of bridge construction: 1. Cast-in-situ Method of Bridge Construction 2. Balanced Cantilever Method Of Bridge Construction 3. Precast Method of Bridge Construction 4. Span by Span Casting method of Bridge Construction 5. Incremental Launching Method of Bridge Construction 6.

article thumbnail

BALANCED CANTILEVER METHOD OF BRIDGE CONSTRUCTION

The Constructor

Construction begins at each bridge pier. The complete pier segment is then used as an erection platform and launching base for all subsequent travelling formwork and concrete segment construction. Segment construction is continued until a joining midpoint is reached where a balanced pair is closed.

article thumbnail

PERMANENT FORMWORK METHOD FOR BEAM CONSTRUCTION

The Constructor

Composite Permanent Formwork: Beam shells perform number of functions: They are generally designed to support precast floor units and construction loads To act as formwork for infill in-situ concrete To act compositely with the in-situ infill to support permanent loads. Their most common use is to form downstand beams.

Concrete 230