Credible Construction Estimate Core Elements

Job Order Contracting

A credible construction cost estimate is required prior to engaging in procurement. The follow elements are common to a credible construction cost estimate. Credible Cost Estimate Core Elements #1 Objectivity – The information used and those invovled in the creation of the construction cost estimate must be objective.

article thumbnail

Job Order Contracting – The Legal Side

Building Information Management

This is NOT intended as ANY form of legal advice or counsel, but simply to share information relative to efficient construction project delivery methods. FACILITIES CONSTRUCTION CVF JOB ORDER CONTRACTS (LEGAL) DATE ISSUED: 10/9/2013 1 of 3 UPDATE 98 CVF(LEGAL)-P. source: [link]. Magnolia ISD 170906. Gov’t Code 2269.401.

Legal 520
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Autodesk Construction Champions 2023: 25 People Powering the Future of Construction 

Autodesk Construction Cloud

Many things make construction an exceptional field to work in. There's also the technology side, where innovations like AI, AR, and robotics take the construction sector to the next level of advancement. So without further ado, we're thrilled to introduce Autodesk's Construction Champions 2023. Wilson & Co.

article thumbnail

HYBRID CONSTRUCTION TECHNIQUE AND STRUCTURAL.

The Constructor

Hybrid concrete construction can incorporate all the benefits of precasting, (e.g. form, finish, colour, speed, accuracy, prestressing, high-quality, assured covers and dense and properly cured covercrete) with all the benefits of in-situ construction (e.g. Structural Action of Hybrid Concrete Construction: 1.

Concrete 214
article thumbnail

METHODS OF BRIDGE CONSTRUCTION

The Constructor

Following are the methods of bridge construction: 1. Cast-in-situ Method of Bridge Construction 2. Balanced Cantilever Method Of Bridge Construction 3. Precast Method of Bridge Construction 4. Span by Span Casting method of Bridge Construction 5. Incremental Launching Method of Bridge Construction 6.

article thumbnail

BIM – Attempting to Run before you can Walk? – BIM EU-wide Procurement Initiative

Building Information Management

Public sector projects would best be served in the short term by adopting collaborative construction delivery methods. Integrated Project Delivery – IPD for major new construction and Job Order Contracting – JOC for renovation, repair, sustainability and minor new construction are just two of several proven processes. .

BIM 40
article thumbnail

BALANCED CANTILEVER METHOD OF BRIDGE CONSTRUCTION

The Constructor

Construction begins at each bridge pier. The complete pier segment is then used as an erection platform and launching base for all subsequent travelling formwork and concrete segment construction. Segment construction is continued until a joining midpoint is reached where a balanced pair is closed.