Remove Airports Remove Contractors Remove Fabrication Remove Retail
article thumbnail

Arup uses 3D printing to fabricate one-of-a-kind structural steel components

BD+C

The research also shows that additive manufacturing has the potential to reduce costs, cut waste and slash the carbon footprint of the construction sector. Body Image: read more.

article thumbnail

Concrete calculator

GCP Applied Technologies

They eliminate the need to lift, carry, hoist, position, cut and tie awkward, heavy sheets or rolls of welded wire fabric (WWF) and thus help to reduce construction time and labor costs. Retail buildings. Contractor. STRUX® macro synthetic fibers eliminate time and labor, versus installing welded wire mesh (WWM). Infrastructure.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Concrete mix design

GCP Applied Technologies

Macro synthetic fibers are used to replace welded-wire fabric in many slab-on-grade applications, including parking areas, flatwork and flooring. Retail buildings. Contractor. TB-1201 – Dosage rates for light use loading applications. Transportation Infrastructure. Underground Solutions. concrete admixture mix design hero.

article thumbnail

Heroic Efforts In California

Buisness Facilities Contributed Content

Jobs created by the program are primarily for contractor services in the clean-energy economy in communities throughout the state and tend to be long-term, family-wage earning positions. The PACE solution also includes consumer protection, business automation software, workforce training and ongoing access to private capital.

article thumbnail

Centers of Technology: The Future Is Now

Business Facilities

Top sectors include computer electronics, health and medical devices, and fabricated metals and heavy machinery. mHUB’s state-of-the-art 63,000-square-foot facility features 10 unique fabrication centers to make the product development cycle as efficient and seamless as possible.

article thumbnail

COVER STORY: Editors’ Location Picks

Buisness Facilities Contributed Content

The IT company’s flagship product is MyOnlineToolbox, a community platform that brings business innovations to contractors who repair and remodel homes. eStockIt.com in Hollywood is an online retailer of restaurant, janitorial and office supplies. 17 on the Forbes inaugural ranking of “America’s Most Promising Companies.”

Omaha 76
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Special Project Procedures for Airport Facilities. 01 43 19 Fabricator Qualifications. Contractor Quality Control. Special Project Procedures for Airport Facilities. 01 43 19 Fabricator Qualifications. Contractor Quality Control. Special Project Procedures for Airport Facilities. Modifications.