article thumbnail

Things Contractors Should Know About Job Order Contracts

Job Order Contracting

Cost and accounting transparency via standardized cost data architectures, terms, and definitions. prison, airport, court house) work and after-hours work will need to be included in the books, or otherwise provided for. Subcontracting: Do. Subcontracting: Don’ts. Value and qualification based selection and procurement.

Contract 100
article thumbnail

Question: What is a VA-BIM? (Variation Administrator; BIM Re-measure Coordinator)

DebunkTheBIM

The new Abu Dhabi (Airport) Midfield Terminal is currently under construction. Definitely not both and definitely not at the same time. And not just at the ‘bottom level’ or, God’ forbid, as an in-sourced (subcontracted) capability, but spread over all levels of management including those that sit at the very top of the ladder!

BIM 48
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What You Need to KNOW about Job Order Contracting

Building Information Management

Cost and accounting transparency via standardized cost data architectures, terms, and definitions. prison, airport, court house) work and after-hours work will need to be included in the books, or otherwise provided for. Subcontracting: Do’s. Subcontracting: Don’ts. Value and qualification based selection and procurement.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport. Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.”

Income 108
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 23 00 Procurement Definitions. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 23 00 Procurement Definitions. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 23 00 Procurement Definitions. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 23 00 Procurement Definitions. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. Requirements.

article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

JOB TRAINING PROGRAM: Originally set to expire in 2011, the Arizona Competitiveness Package extended the program an additional five years until December 31, 2016 and modified the definition of a “rural area.”. $25 A business or portion of a business involved in the maintenance of aircraft is not eligible. MISSISSIPPI.

Income 75