Remove Airports Remove Documentation Remove Modeling Remove Subcontracting
article thumbnail

Job Order Contracting in Canada

Building Information Management

Why the Job Order Contracting model could work in Canada. A proven contracting methodology from the United States may be a model for solving some of Canada’s current contracting demands. federal departments/agencies, as well as state/county/local governments, colleges/universities, healthcare, and airports/transportation.

article thumbnail

40 Under 40: Champions of Construction 2023

Autodesk Construction Cloud

At the core of Stephen's contributions lies his exceptional skill in optimizing Building Information Modeling (BIM) execution plans, setting elevated global practice standards, and significantly enhancing the quality of both models and contract drawings. Aside from his leadership, Chris is also big on knowledge-sharing.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Feature Story: 2016 Economic Development Awards

Buisness Facilities Contributed Content

Pennsylvania’s decision to consolidate hundreds of bridge projects into a single procurement financed by a bond fund managed by a new Public-Private Partnership (P3) should serve as a model for the rest of the country. There are an estimated 4,000 bridges in PA rated structurally deficient.].

Indiana 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Specifications Group: Five subgroups.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). Specifications Group: Five subgroups.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

In 2001 the MRZ designation was renewed for the former Williams Air Force Base, now known as Williams Gateway Airport. Naval Air Facility in Goodyear, now known as Phoenix/Goodyear Airport, was designated as an MRZ. ARB must approve hybrid truck and bus models for them to become eligible for the program.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

An ‘aviation development zone’ is any airport in Colorado that is a public-use facility designated by the FAA in its latest National Plan of Integrated Airport Systems, which has registered with the Colorado Office of Economic Development and International Trade (OEDIT).

Income 75