Remove Airports Remove Drawings Remove Inspections Remove Roads
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

What Is Transportation Engineering | Major Disciplines of Transportation Engineering | What Do Transportation Engineers Do

CivilJungle

The main role of civil engineers is to maintain the current existing roads and infrastructure for it is efficient and safe traffic activity. Also, Read: Kerbs In Roads | Types of Kerbs | Shape of Kerbs | Materials of Kerbs in Roads | Kerb Height | What Is Kerb Stone | Materials of Kerb Stone | Road Kerb Details.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Depending on how big or complicated the pour is, the inspection may just take few minutes or it could take hours. Below are the checks that should be verified before pouring begins: Is the formwork erected in accordance with the approved drawings? Only when the formwork has been approved, may the pour take place.

Concrete 235
article thumbnail

REINFORCEMENT COVER AND PRE-CONCRETE CHECKS

The Constructor

The required amount of cover will always be specified on the design drawings, but no time should the cover be less than the maximum size of aggregate plus 5mm. The first part is a visual inspection by the clerk of works or equivalent. Right side images shows correct way of placing of reinforcement.

Concrete 250
article thumbnail

FORMWORK AND GOOD FORMWORK PROPERTIES

The Constructor

For anything other than most smallest of concreting jobs e.g. walls over 1m in height, a drawing should be provided, showing what formwork is required. This need not be an intricate design drawing, a simple sketch is usually sufficient. Always inspect the formwork prior to pouring.

Concrete 223
article thumbnail

Free Interior Design Softwares

The Constructor

The work of an interior designer draws upon many disciplines including environmental psychology, architecture, product design, and traditional decoration (aesthetics and cosmetics). Can you please give the detail drawings showing the arrangements of consecutive layers of bricks? What will be the total thicknesses of the walls?This

Software 114
article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

8) inadequate preparation and review of contract and shop drawings. (9) Other common causes of structural failure are: (5) lack of appropriate professional design and construction experience, especially when novel structures are needed. (6) 6) complexity of codes and specifications leading to misinterpretation and misapplication. (7)

Concrete 177