Remove Airports Remove Electrical Remove Fabrication Remove Life Cycle
article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

The additional infrastructure needs or talent required to be successful in life-cycle data collection & analysis. This is an excellent class for BIM/VDC managers, electrical detailers, and subcontractors. The potential value in analyzing data and how you can use it to drive better decision-making.

article thumbnail

Centers of Technology: The Future Is Now

Business Facilities

DMDII currently works with over 300 academic, government and industry partners such as Dow, General Electric (GE), Lockheed Martin, Boeing and Microsoft, to name a few. “A Top sectors include computer electronics, health and medical devices, and fabricated metals and heavy machinery. Photo: Havas PR).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Emergency” includes bombings and bomb threats, civil disturbances, fires, explosions, electrical failures, loss of water pressure, chemical and gas leaks, medical emergencies, hurricanes, tornadoes, floods, and earthquakes. Fabrics labeled with the Underwriters Laboratories Inc.,

article thumbnail

Federal Real Property Regulations (FAR / FMR)

Building Information Management

Emergency” includes bombings and bomb threats, civil disturbances, fires, explosions, electrical failures, loss of water pressure, chemical and gas leaks, medical emergencies, hurricanes, tornadoes, floods, and earthquakes. Fabrics labeled with the Underwriters Laboratories Inc.,

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. Special Project Procedures for Airport Facilities. 01 43 19 Fabricator Qualifications. 01 51 13 Temporary Electricity. 01 86 26 Electrical Performance Requirements. Special Project Procedures for Airport Facilities. 01 43 19 Fabricator Qualifications.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. Special Project Procedures for Airport Facilities. 01 43 19 Fabricator Qualifications. 01 51 13 Temporary Electricity. 01 86 26 Electrical Performance Requirements. Special Project Procedures for Airport Facilities. 01 43 19 Fabricator Qualifications.