article thumbnail

The next destination: Passive design airports

BD+C

The next destination: Passive design airports 0 qpurcell Thu, 04/18/2024 - 13:59 Airports Today, we can design airports that are climate resilient, durable, long-lasting, and healthy for occupants—we can design airports using Passive House standards. On the path to passive The airport itself is becoming more sustainable.

article thumbnail

Building Hong Kong's Airport

The Constructor

The two former islands that were levelled comprise about 25% of the surface area of the airport’s 12.55 Land reclamation for the airport added nearly 1% to the entirety of Hong Kong’s surface area. The project is the most expensive airport project ever, according to Guinness World Records. km² platform.

Airports 203
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STRUCTURAL DEFECTS OF FOUNDATIONS AT CONSTRUCTION.

The Constructor

The problem areas, effects in foundation and defects in structure due to those causes are presented here. Problem Areas Effect on foundation Defects in structure Insufficient depth of foundation (mostly in soft clayey soil) Movement of foundation due to changes in water table seasonally, and movement due to trees and vegetation.

article thumbnail

SOLING UNDER FLOORS & FOUNDATIONS

The Constructor

Rubble Stone Soling: The rubble stone generally used are of best variety of black trap / granite / basalt or other variety of stone available locally. The stone should be hard, durable free from defects and of required size as required at site or as per specification. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

article thumbnail

SETTING OUT OF FOUNDATION TRENCHES

The Constructor

The following points should he observed while setting out trenches: (i) Profiles, nails, strings and lime are used for Setting out the foundation plan. (ii) 2) The axial lines (center lines) of the trenches are marked with the help of profiles, sighting rails, strings and pegs. (3)

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Prepare Estimation and Budgets. Foundation. Design Process. Stages of work in a glance.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

Organizing projects means defining roles and responsibilities, create a project charter, and develop high-level time and cost estimates. While doing planning for the project, effective and clear estimate of the time and costs are done. Organizing of the project is an important step towards planning of the project.