Remove Airports Remove Risk Remove Safety Remove Schedule
article thumbnail

Data Scientists Reveal 5 Surprising Construction Insights to Manage RiskĀ 

Autodesk Construction Cloud

And with good reason: the right insights can improve everything from project cost and timeline accuracy to reducing the risk of lawsuits and disputes, and even winning more business. An example of a data point might be the number of overhead mechanical racks installed on the job that day, or logging the root cause of a safety incident.

Risk 52
article thumbnail

Safety Hazard on Construction Projects

The Constructor

This leads to the presentation of an Information Technology IT tool for construction project safety management Total-Safety and, in particular, a module within Total-Safety designed to help construction personnel develop method statements with improved levels of hazard identification.

Safety 114
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Achieving project success through product and material testing

Construction Specifier

The construction industry faces a myriad of challenges, such as completing projects on schedule, ensuring the quality and safety of products and materials, overseeing the costs so they do not exceed the budget, and complying with corporate environmental and social responsibility standards; all while applying effective risk management at every step.

article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Silver Line Metrorail project leading to the Dulles International Airport. Sometimes, the project won’t pass inspection, or it will need to be torn down due to safety and health concerns. 4: Create the Appropriate Repair Schedule. Finally, take a look at the overall construction schedule.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

In this phase you assemble your team and assign tasks to individuals, develop a budget for the project, develop a schedule and create a communications plan. Team members monitor and control progress in terms of cost, time, and quality; and manage risk.

article thumbnail

Subways in America

The Constructor

RECOMMENDED FOR YOU Building Hong Kong’s Airport Close All rights reserved.

America 203
article thumbnail

TEMPERATURE EFFECTS ON CONCRETE

The Constructor

Knowledge of the magnitude of the thermal movement is necessary to evaluate the risk of thermal cracking in situations where large thermal gradients are likely to occur, and to calculate dimensional changes in structures such as bridge decks. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

Concrete 194