article thumbnail

BIM Objects, Data, and Information – More than a 3D Pretty Picture – Soooo Much More!

Building Information Management

At present, the NBS National BIM Library objects are classified using both the draft Uniclass 2 Work result code and the System name to give a deeper link between the object and specification. Figure 3: Connection to a wider source of information empowers the object. cubicle, partition, door and signage systems).

BIM 51
article thumbnail

Revit Beginners: My Work

Revit Beginners

In this tutorial I have drawn four leves Lines as follows: - Level 1 - Line is drawn at -14 Level 2 - Line is drawn at -10 Level 2 - Line is drawn at 0 Level 2 - Line is drawn at 10 Then I switch to Level 1, I click on Wall Icon in Design Bar & select "Basic Wall Foundation -12" concrete. ArchiCAD vs Revit. Marathon Drafting.

Revit 40
article thumbnail

Revit Beginners: Stepped Foundation Plans

Revit Beginners

Duplicate your Basic Wall: Foundation - 12" Concrete for each stem wall and footing size you need. ArchiCAD vs Revit. Marathon Drafting. We often have split level projects and weve had a lot of trouble isolating the stem walls and footings from the rest of the model for use in a foundation plan. that is until Revit 9.0

Revit 40