Remove Architecture Remove Drafting Remove Reference Remove Subcontracting
article thumbnail

Specifications for design-build projects

Construction Specifier

DBB and its ‘relatives’ are longstanding methods of project delivery with clearly defined roles and responsibilities, and, therefore, drafting construction specifications for such projects is reasonably straightforward. EJCDC refers to them as “conceptual documents” and the AIA’s corresponding term is “owner’s criteria.”

EJCDC 52
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

It remains the leading standardized data architecture for organizing line item construction cost data, construction specifications, and similar information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 33 29.05

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

It remains the leading standardized data architecture for organizing line item construction cost data, construction specifications, and similar information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 01 33 29.05

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

architectural and engineering, interest incurred during construction, etc.). Internal Revenue Code Credits Adopted by Reference (AS 43.20.021): Under Alaska’s blanket adoption of the IRC, taxpayers can claim all federal incentive credits. This tax credit program was previously referred to as the Blue Collar Tax Credit.

Income 108