Remove Architecture Remove Estimating Remove Foundation Remove Life Cycle
article thumbnail

Demand For Efficient Life-Cycle Building Management Processes – BIM, JOC, IPD – FIATECH PRESENTATION – 2012

Building Information Management

For example, estimating a job requires knowledge about about the impact that AE, context, and execution scope have on each unit, assembly, and system level cost. A “FACEBOOK for Facilities Construction and Life-cycle Operations” is on the horizon. Click to view slideshow.

article thumbnail

Building Information Management Framework – BIMF – People, Process, Technology

Building Information Management

While at first perhaps a bit intimidating… illustrating the life-cycle management within a BIM context is relatively straightforward. Model views and overall life-cycle management are similar in this regard. Data exchange is therefore a critical aspect.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Improving Renovation, Repair, and Maintenance Project Delivery

Job Order Contracting

Educational and training programs must focus upon asset life-cycle management and modeling. Overall focus must shift from first-cost mentality to life-cycle/total-cost-of-ownership. Timely, accurate, repeatable, and verifiable information based upon standardized terms, definitions, and data architectures.

article thumbnail

Define Construction Procurement

Job Order Contracting

architectural or engineering/design, the construction, alteration, repair, refurbishment or fitting out of buildings and other structures; . architectural or engineering/design, the construction, alteration, repair, refurbishment or fitting out of buildings and other structures; . Services and/or work may include… .

article thumbnail

Process centric data models are needed for BIM and ….

Building Information Management

BIM, the life-cycle management of the built environment supported by digital technology is all about the integration of PEOPLE and PROCESSES and INFORMATION. Visualization/QTO – 2d/3d visualization, pattern search, Procurement/Project Management – IPD, JOC, Cost Estimating, Scheduling.

article thumbnail

Open BIM – What’s it going to take to get there?

Building Information Management

Life-cycle perspective and management techniques/processes… vs. a “first cost mentality” 5. Industry Foundation Classes (IFC) – structure enabling native storage of instance models. Representational State Transfer (REST) is an architectural style for large-scale software design. and Canada.

BIM 55
article thumbnail

The Great Carbon Reckoning

Natural Building

He was game to try it in the foundation. It was more than all my commuting choices for the rest of my life,” Simonen says. with credits for procuring low-carbon materials and compiling a Life Cycle Analysis (LCA) for projects. Now, that is scale.’”. In 2012 LEED introduced its new rating system (4.0)