article thumbnail

Download Bar Bending Schedule Of Box Culvert

Construction Cost Estimating

Definition of Bar bending schedule(BBS) Bar bending schedule alias schedule of bars refers to a list of reinforcement bars, a specified RCC work item that is shown in a tabular form for a smooth view. While generating bar schedules, it is important to take proper care about length.

article thumbnail

CAD Shack: Revit Parameters - AUGIWorld Article

CAD Shack

Revit Parameters - AUGIWorld Article. I have an article in the current issue of AUGIWorld. Check out page 20 for how you can assign MEP scheduled parameters to items placed in the architectural model. For those of you trying to contact me on this article. My last two articles with AUGIWorld have used an old bio.

CAD 40
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

CAD Shack: Revit MEP How to Create a Lighting Fixture Schedule

CAD Shack

Revit MEP How to Create a Lighting Fixture Schedule. A big advantage is the ability to quantify Revit objects in schedules. Out of the box, a user need only understand the scheduling function in Revit to start leveraging that data inherent in the model. Revit schedules report data that is contained in families.

CAD 45
article thumbnail

CAD Shack: New Blog Awesome Article - Using Revit MEP to.

CAD Shack

New Blog Awesome Article - Using Revit MEP to Calculate Flows For Sizing Duct and Pipe. Revit MEP How to Create a Lighting Fixture Schedule. Articles in the Attic. Articles in the Attic. Autodesk Fabrication 2013 at Autodesk University 2013. Monday, January 17, 2011. Check it out. Nice job Phil. Todd Shackelford.

CAD 40
article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

Construction of wall, floor, and roof systems offsite has multiple advantages, including compressing the project schedules, reducing site labor and waste, improving consistency and quality control, and increasing safety for workers. Multiple materials can be pre-panelized to provide the best efficiencies and results.

article thumbnail

Boeing To Locate New 777X Composite Wing Center In Everett, WA

Buisness Facilities Contributed Content

Boeing evaluated criteria that were designed to find the wing fabrication location that would best support the 777X business plan. As part of the contract extension, the company agreed to fabricate the parts for, and assemble, the 777X composite wings in the Puget Sound region. Jay Inslee.

article thumbnail

BIM at LOD400: Why Level of Development 400 matters for design and virtual construction

BD+C

By broadening design to anticipate construction issues and delivering a fabrication-ready model, engineers can create more certainty in cost, schedule, and design intent. It is this uncertainty that is the breeding ground for risk, unmet cost and schedule expectations, and loss of trust between project partners.

BIM 59