article thumbnail

LEED Commercial Interiors can Save the Planet

Green Building Law Update

There are 2 options to achieve the CI v4 MRc6: Construction and Demolition Waste Management credit, either diverting waste from landfills or now new and improved v4 provides a novel alternative for source reduction that is not generating more than 2.5 in Baltimore with focused experience in green building. Kaplow, P.A.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

Currently, the Port of Baltimore and Port of Virginia (in Norfolk) are the only East Coast ports that can accommodate the large ships. BALTIMORE IS READY TO GREET THE BIG SHIPS. The Port of Baltimore is one of only two East Coast ports, along with the Port of Virginia in Norfolk, now able to handle post-Panamax ships.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Maryland Adopts 42 New Environmental Laws in 2021

Green Building Law Update

House Bill 1069 requires an owner of a residential rental property that is served by a private water supply well to provide the results of the most recent water quality test when a tenant signs a lease and then for water quality testing every three years and disclose the results to current and prospective tenants. Stormwater Management.

Maryland 156
article thumbnail

2018 IgCC is Not in Use Anywhere. A Detailed Analysis of Why?

Green Building Law Update

now requires “not less than 90% of the land-clearing debris, excluding invasive plant materials, shall be diverted from disposal in landfills and incinerators” versus 75% of building site waste management in 2012. Washington DC, Baltimore City, Montgomery County, Maryland, etc.) Sec 501.3.8.1 Sec 1001.3.2 The 2015 IgCC (.

Green 156
article thumbnail

Cover Story: 2014 Business Facilities – Metro And Global Rankings

Business Facilities

IBM Services Center: Baton Rouge will deliver technology services including application development, application management and system integration. The Port of Baltimore has had a 50-foot deep channel since 1990. The new tech center will provide IBM’s clients in the U.S. Mobile, AL rounds out our top three in Economic Growth Potential.

Metro 111
article thumbnail

COVER STORY: Editors’ Location Picks

Buisness Facilities Contributed Content

a Miramar managed services provider to small businesses; and Blue Frog Solutions in Pompano Beach, a leading provider of middleware solutions for life insurance carriers, underwriters and their distributors and agents. Other locations that performed well were Baltimore, St. The bioscience industry in Georgia created $19.5

Omaha 76
article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

IBM Services Center: Baton Rouge will deliver technology services including application development, application management and system integration. During construction of the new riverfront complex, IBM will be temporarily lease space at the Essen Centre office complex in Baton Rouge. With its proximity to the center of the U.S.

Metro 110