Remove Banking Remove CAD Remove Certification Remove Compensation
article thumbnail

20 construction industry trends to watch in 2020

Building Radar

Now the data already recorded for the EnEV certificate can be used as the basis for a building eco-balance. In the planning phase, aerial photographs from the remote-controlled aircraft provide the data material for 3D CAD or BIM model. They also help to compensate for the lack of skilled workers.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Fire Life Safety (Fire Alarm) system testing shall be performed by a licensed and certified testing company as required to maintain the building UL certification. Special Instructions: Fire Alarm System needs UL certification every five years. Load Bank Testing. Application: This standard applies to load bank testing.