Cool-n-Save Proves High Humidity Performance
U.S. Construction
NOVEMBER 24, 2011
” The study uses data collected during a 21-day field test at a major data center in Las Vegas with data collected since September from an office building in Jaco, Costa Rica. The field test in Las Vegas was conducted in August 2011, when relative humidity was below 34% and temperatures were well above 95°F.
Let's personalize your content