Remove Bidding Remove Books Remove Overhead Remove Subcontracting
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). JOB ORDER CONTRACT (JOC) EXECUTION GUIDE. authorization. UPB rate and the Contractor’s multiplier.

Contract 100
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Design-Bid-Build. Traditional design-bid-build (DBB) delivery process with design, bidding, and construction in separate, sequential steps. Construction contract is generally awarded to the lowest bidder and/or lowest qualified builder, who then utilizes the subcontractors included in his or her bid. Advantages.

Design 130
article thumbnail

Job Order Contract – Frequently Asked Questions

Job Order Contracting

Required software, Unit Price Book, other “tools”, and training etc. What is a Unit Price Book? Job Order Contracts require a unit price book, UPB. Job Order Contracts require a unit price book, UPB. What are the characteristics of a “good” unit price book?

Contract 100
article thumbnail

FAQ's About Outsourced Contractors Bookkeeping Services

Contractor Bookkeeping

A lot of contractors would like to subcontract out their bookkeeping services and the two main reasons they don''t is fear of losing control and cost. It only makes sense to subcontract it out to professional construction accountants who have done it thousands of time and have a process in place to see to it that it gets done right.

FAQ 49
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Job Order Contracting enables a pre-qualified contractor(s) to perform repair, renovation, or minor construction of a facility or other form of built structure based on pre-described and pre-priced tasks as defined within a Unit Price Book – UPB. Unit Price Books. Job Orders / Task Orders.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.