Remove Bidding Remove Commissioning Remove Negotiation Remove Travel
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

It also (ideally) details the terms and conditions of the construction or repair contract and itemises all work to enable a contractor to price the work for which he or she is bidding. This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include start-up and commissioning costs.

article thumbnail

Logistics: On the Road, Water or Rails…or in the Air — AGAIN

Business Facilities

The less money that is needed to spend on gas and other work-related travel, the more money that can be spent on everything else. “In In addition, Brunswick County is one of the localities that receive economic development support from the Tobacco Region Revitalization Commission. Four sections are now open to travelers.

Roads 41
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 11 13 Advertisement for Bids. 00 11 16 Invitation to Bid. 00 24 13 Scopes of Bids. Scopes of Bids (Multiple Contracts). Scopes of Bids (Multiple-Prime Contract). 00 25 13 Pre-Bid Meetings. 00 41 00 Bid Forms. 00 41 13 Bid Form – Stipulated Sum (Single-Prime Contract). Requirements.

article thumbnail

North Dakota Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

State Water Commission funds, not exceeding $20,000 per borrower, may be used to supplement Ag PACE funds for the purchase of irrigation equipment on new irrigated acreage. Costs can include: Instructor wages, per diem and travel. Within that definition, the qualifying organizations must also meet a capital spending requirement.

article thumbnail

North Dakota Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

Agricultural Products Utilization Commission (APUC): The mission of APUC is to create wealth and jobs though the development of new and expanded uses of North Dakota’s agricultural products. Costs can include: Instructor wages, per diem and travel. This is accomplished through the administration of a grant program.